Mixing Several Stones in One Container: How Crate Planning Works

Mixing materials in one container is standard practice for first orders and multi-area projects - tiles for the lobby, granite for the facade, mosaic accents in the same box. The quotation prices each material separately, but the container itself succeeds or fails on one document: the crate plan. What can share a crate, and what cannot:
  1. Same thickness, same family packs cleanly. 20 mm granite tiles and 20 mm granite cut-to-size pieces ride together in carton crates - same weight per square metre, same handling.
  2. Different thicknesses go in different crates, never mixed inside one. A 30 mm paver stacked on a 20 mm tile cracks the tile at the first hard brake. Crate separation costs nothing; re-cutting costs a production cycle.
  3. Slabs never share crates with tiles. Slab bundles sit on A-frames in their own fumigated crates - tiles crated flat on top of an A-frame bundle is the single most common cause of transit damage we see in competitor shipments.
  4. Mosaic and small-format ride in cartons inside a tile crate, cushioned, never on the crate floor where forks enter.
How the layout is confirmed: after the REF quotation is approved, we return a crate plan listing every crate - contents, dimensions, weight and position in the container. Weight drives the order of loading: heavy granite crates on the floor, lighter marble crates above, mosaic cartons last. The packing list that travels with the container itemises each bundle against the plan, so your receiver checks crates, not guesses. Two rules that protect your budget. First, state quantities per material with a stated overage at quotation stage - mixing is planned once, and late additions force a re-plan that can cost the loading window. Second, keep each material above its practical minimum: one crate of a material is the smallest sensible unit, because less than a crate means paying for unused crate volume. Mixed containers ship under the same fumigated-crate standard as single-material orders, with photo-documented loading against the REF number. Send your material list with quantities - the quotation comes back with the crate plan stated in one working day.

Quick answers

Is there a minimum quantity per material in a mixed container?

One crate per material is the practical minimum - below that you pay for crate volume you do not use. Quantities within a crate can mix freely where thickness and finish match.

Does mixing materials delay production?

Not if quantities are fixed at quotation - the crate plan is drawn once and each line cuts to its own schedule. Late additions are what force re-plans.

Who confirms the mixed layout?

You approve the crate plan against the REF number before loading; the packing list matches it crate by crate.

Send drawings, get a REF quotation

Drawings, BOQ or a material reference - quotation with crate plan, grade and lead time within one working day.