Read the order process in the sequence it actually happens
A hub for the stages between choosing a material and receiving it. It explains which capability page answers which buyer worry, why the process is described as a sequence rather than a set of promises, and where order-specific scope is confirmed in writing.
Current stock, dimensions and test data are provided on request against source documents.
Between choosing a stone and taking delivery of worked pieces there is a stretch of work most buyers never see, and that is where anxiety tends to gather. Will the edges arrive intact, will the finish match the sample, will the crates be packed in a usable order, will the paperwork be ready. This page is a map of that stretch. It names the stages in the order they actually happen and points each common worry to the one page that answers it in detail. It is deliberately a sequence rather than a set of promises, because a stone order is a chain: a decision made late at one stage travels downstream. Read it to understand what happens when, and where the exact scope of your own order is written down.
The order read as a sequence from selection to delivery
Seen from the workshop, an order runs through a fixed order of operations. Material is selected and reserved; the drawing is approved and pieces are cut to size; edges, cut-outs and finishes are applied; the set is inspected against the agreed criteria; the pieces are numbered, protected and packed; and the load leaves with its documents. Finishing follows cutting, inspection follows finishing, packing follows inspection, and shipping follows packing - each stage consumes the output of the one before it. Presenting them as a list of services hides that dependency. Presenting them as a sequence explains why we hold certain approvals early and why a late change is expensive. If you understand the order, you can predict which question needs answering before a stage closes rather than after it has already moved on.
Which capability page owns each common buyer concern
Almost every pre-order worry has a natural home. Fear of a wrong size or a misplaced cut-out belongs to the cut-to-size page, where the drawing becomes numbered pieces. Concern about how a face will look and wear belongs to the surface-finishes page. Worry about a mismatch with the approved sample, or about chipped edges, belongs to the quality-control page, where acceptance is agreed before cutting. Anxiety about damage in transit and about paperwork belongs to the packing-and-shipping page, which covers protection, load order and documents. This hub does not answer those questions itself; it tells you which door to open. Routing the concern to the right stage means you read the detail that actually governs it, rather than a general reassurance that covers nothing in particular.
Why the stages are descriptions of work, not commercial promises
There is an important boundary here. These pages describe what the work involves - what a shop drawing shows, what an inspection looks at, how a crate is built - rather than committing to a figure, a duration or a commercial term for any specific order. A process description is general and stable; a promise about your job depends on the material, the drawing, the quantity and the destination, and belongs in a written reply against the real requirement. Keeping the two apart is what lets the process pages stay honest. Our preference is to explain how a stage works and then confirm what your order includes in writing, instead of printing a rounded commitment that a particular project quietly contradicts. Read the stages to understand the work; read the reply to know the scope.
How a change at one stage affects the stages after it
The chain matters most when something changes. Move a cut-out after the drawing is approved and the cutting schedule, the edge work and the numbering all have to be revisited. Change a finish after the blocks are allocated and the sample, the inspection criteria and possibly the material reservation move with it. Alter the installation sequence after packing and the load order and the marking have to be redone. None of these is impossible, but each is cheaper to make before its stage closes than after. That is why we front-load approvals: drawings, samples and acceptance criteria are agreed early so the downstream stages can run without interpretation. A buyer who knows the sequence can time a decision to land where it costs least instead of where it cascades.
Where order-specific scope is fixed in a written reply
The general process is public; the specifics of your order are not decided on a webpage. Scope - which material, which pieces, which finish, which documents, which acceptance criteria - is fixed in a written reply at enquiry, against the actual requirement, and that note becomes the shared reference for everything that follows. It is also where anything unusual is named: a phased delivery, a destination with particular paperwork, a test record the project will ask for, a dry-lay before dispatch. If a detail is not in that written note, it is not part of the agreed scope, which is exactly why we ask for these things early. The pages tell you what to raise; the reply records what was agreed. Confusing the two is how orders drift.
What to state so the right process pages are referenced in the reply
A first message that names the stages you care about gets a more useful answer. Tell us whether the job is stock sizes or cut-to-size, since that decides whether the drawing stage applies. Say what finish you have in mind and what the surface will face, so the finishes page can be referenced. Flag any acceptance or documentation requirement early, particularly if a project needs specific records, because those belong in the enquiry rather than at dispatch. Mention the destination and, if it is known, the installation order, since both shape packing. With those points we can point you to the relevant process pages and set out in the written reply exactly which stages your order will pass through and where approvals are needed.
The stage sequence and the document that closes each step
The stage sequence is closed by documents, not by habit. Each step is signed off against a named paper: material reservation, the approved drawing, the finish sample, the inspection note, the packing list and the dispatch papers. Request a reply that lists those documents in order and states which one closes each stage. Acceptance criteria are written before cutting, so the set can be checked against an agreed standard rather than against a memory of what was approved. Where a project needs a particular record, that requirement is raised at enquiry and named in the note, so it can be prepared before dispatch instead of assembled afterwards. The list of closing documents is what a later question about scope is settled against.
An inspection gate and the criteria written before cutting
An inspection gate is more useful to a buyer as a written threshold than as a promise of care. Comparing a described check with an agreed criterion shows the difference: the first says an edge was looked at, the second says what condition it had to meet. Ask the supplier to set down, in the reply, the areas reviewed at each gate and the reference used for each, and to name who signs that review. A photographic record tied to piece numbering supports the same threshold, because it lets a disputed piece be found again. Without criteria fixed before cutting, an inspection becomes a conversation at delivery, which is the least convenient moment to discover that the two parties never agreed on what acceptable meant.
The cutting schedule and the order of approvals behind it
The cutting schedule is released only after a fixed chain of approvals. First the material is reserved against the brief. Next the shop drawing is signed and the piece numbering issued. Then the finish is approved on a sample, and only then are blocks allocated to the saw. The reply ought to name each approval and the order in which it falls, since a change arriving after the drawing is signed travels back through all of them. The reply should also state which document a revision is logged against. Holding that order on one note lets the workshop see, at any moment, which decisions are frozen and which are still open, rather than discovering a late change after pieces already exist.
A stage change downstream and the note it is logged against
A downstream change cannot be treated as a local edit, because the stages after it have already consumed the earlier decision. If a cut-out moves after the drawing is signed, the cutting schedule, the edge work and the piece numbering all have to be reissued; if a finish changes after blocks are reserved, the sample and the inspection criteria move with it. Ask for a written confirmation that names which documents are reissued for a given change and who authorises them. Where the alteration arrives after packing, the load order and the crate marking are revisited too. Logging the change against the original approval, rather than quietly absorbing it, is what keeps a later discrepancy traceable to a decision instead of to an unexplained difference on site.
Process stages
Process stages
How an order moves from an approved drawing to a packed shipment.
Cut-to-size fabrication
Cut-to-size stone fabrication from shop drawings: dimensional cutting, edge work, cut-outs, sequencing and dry-lay checks.
View pageSurface finishes
Guide to stone surface finishes: polished, honed, flamed, bush-hammered, brushed, tumbled and sawn, and where each is normally specified.
View pageQuality control and inspection
How stone orders are checked: visual consistency, dimensional verification, finish review, numbering and pre-dispatch inspection records.
View pageExport packing and shipping
Export packing and shipping for stone: crate design, protection, loading sequence, marking and the documents that accompany a shipment.
View pageContinue from here
Where stone fabrication leads next
Each link below opens a page that answers one specific buying question.
Related materials
Where the surface is used
What we can fabricate
Collapse
What to settle before stone fabrication is specified
How do I compare stone quotations built on different scope definitions? | How is stone packed for export and how is wood packaging marked? | What should the written specification for a first stone container cover?
A hub for the stages between choosing a material and receiving it. It explains which capability page answers which buyer worry, why the process is described as a sequence rather than a set of promises, and where order-specific scope is confirmed in writing.
- How do I compare stone quotations built on different scope definitions?
- How is stone packed for export and how is wood packaging marked?
- What should the written specification for a first stone container cover?
- How should Incoterms and payment terms be set for a first stone order?
- How do I arrange a pre-shipment inspection for a stone container?
Process
How an order moves, stage by stage
Cut-to-size fabrication
Cut-to-size stone fabrication from shop drawings: dimensional cutting, edge work, cut-outs, sequencing and dry-lay checks.
Read the stage
The scope for this stage is confirmed in writing against the current source documents for the order.
Export packing and shipping
Export packing and shipping for stone: crate design, protection, loading sequence, marking and the documents that accompany a shipment.
Read the stage
The scope for this stage is confirmed in writing against the current source documents for the order.
Quality control and inspection
How stone orders are checked: visual consistency, dimensional verification, finish review, numbering and pre-dispatch inspection records.
Read the stage
The scope for this stage is confirmed in writing against the current source documents for the order.
Surface finishes
Guide to stone surface finishes: polished, honed, flamed, bush-hammered, brushed, tumbled and sawn, and where each is normally specified.
Read the stage
The scope for this stage is confirmed in writing against the current source documents for the order.
Buyer questions
Questions answered on their own pages
Why would a buyer source stone through Ningbo rather than a quarry cluster?
How do I check a Chinese stone supplier's entity and export documents?
What should the written specification for a first stone container cover?
How should Incoterms and payment terms be set for a first stone order?
Pick a route
Start from the question you need to answer
Stone wall cladding
Stone wall cladding guidance: fixing systems, panel sizing, veining continuity, book-matching and interior versus exterior finish selection.
What this page settles
Stone wall cladding is answered against the written brief rather than a general description of the material range.
Engineered stone
Engineered stone surfaces for repeatable commercial fit-outs, countertops and vanity tops. Consistent batches and cut-to-size fabrication.
What this page settles
Engineered stone is answered against the written brief rather than a general description of the material range.
Exotic stone selection by individual slab: records before cutting
How exotic stone is bought slab by slab: a photographed inventory, book-matched pairs, backlighting review, and a dry-lay plan that ties each reserved piece to a position.
What this page settles
Exotic stone selection by individual slab: records before cutting is answered against the written brief rather than a general description of the material range.
Granite
Granite for flooring, exterior paving, cladding, countertops and landscaping. Slabs, tiles and cut-to-size from one Chinese stone supplier.
What this page settles
Granite is answered against the written brief rather than a general description of the material range.
Cut-to-size fabrication
Cut-to-size stone fabrication from shop drawings: dimensional cutting, edge work, cut-outs, sequencing and dry-lay checks.
What this page settles
Cut-to-size fabrication is answered against the written brief rather than a general description of the material range.
Export packing and shipping
Export packing and shipping for stone: crate design, protection, loading sequence, marking and the documents that accompany a shipment.
What this page settles
Export packing and shipping is answered against the written brief rather than a general description of the material range.
Enquiry
Prepare the brief before you write
No receiving service is attached to this form. Select the brief below and copy it into the channel you already use with us; scope is confirmed in a written reply.
Common questions
Questions buyers ask
Which process page covers the risk of chipped edges in transit?
That worry has two homes, and the hub points to both. The quality-control page covers how edge condition is checked against agreed acceptance criteria before a piece is released, while the packing-and-shipping page covers how edges are protected between pieces, how the load is built and how crates are marked. Protection and load order are technical steps, not shipping formalities, and they are planned from the installation sequence where that is known. Read those two pages for the detail; the exact measures for your order are confirmed in the written reply.
Do the stages happen in the order shown on this hub?
They do, and the reason is dependency rather than habit. A cut cannot be made until a drawing exists, a finish cannot be judged until the piece is cut, nothing can be packed until the set has passed inspection, and a load cannot leave until the crates are marked and the papers are ready. Each step hands something concrete to the next, so running them out of order simply sends work backwards. The sequence itself does not change from job to job; what changes is how much detail each step needs for your particular scope, and that is what the written reply sets out. If you are worried about a stage, name it in the enquiry and we will show where its approval sits.
Are these pages a guarantee of what my order will include?
No. They describe the work a stage involves, not a commitment about a specific order. What your job includes - the material, the pieces, the finish, the documents, the acceptance criteria - is fixed in a written reply against the real requirement, and that note is the shared reference for the whole order. Keeping process descriptions separate from commercial promises is deliberate: it lets the pages stay general and honest while the reply stays specific. Read the stages to know what to raise at enquiry, and read the reply to know what was agreed.
What should the reply list about the stages my order passes through?
Ask for the closing paper attached to each stage, in the order the work happens. Have the reply name who signs each one, since an unsigned stage is still open. Acceptance checks are agreed before any cutting, so a finished set is read against criteria written down in advance rather than recalled later. That ordered list is what a later scope question is settled against, and belongs in the brief, not assembled at dispatch.
How is a late change to a cut-out recorded after the drawing is signed?
It is logged against the original approval, not absorbed quietly. The reply should name which documents are reissued, including the cutting schedule, the edge work and the piece numbering, and who authorises them. A revision arriving after packing also revisits the load order and crate marking. Keeping that trail lets a discrepancy at delivery be traced to a decision instead of appearing as an unexplained difference between the drawing and the pieces that arrived.
Bring the whole material schedule into one enquiry
Tell us the application, material family, finish, format and destination. We reply with the scope as we understand it, current availability and the documentation your project needs.